×

Integrated vendor-buyer cooperative inventory models with controllable lead time and ordering cost reduction. (English) Zbl 1085.90002

Summary: This study deals with the lead time and ordering cost reduction problem in the single-vendor single-buyer integrated inventory model. We consider that buyer lead time can be shortened at an extra crashing cost which depends on the lead time length to be reduced and the ordering lot size. Additionally, buyer ordering cost can be reduced through further investment. Two models are presented in this study. The first model assumes that the ordering cost reduction has no relation to lead time crashing. The second model assumes that the lead time and ordering cost reduction are interacted. An iterative procedure is developed to find the optimal solution and numerical examples are presented to illustrate the results of the proposed models.

MSC:

90B05 Inventory, storage, reservoirs
PDFBibTeX XMLCite
Full Text: DOI

References:

[1] Banerjee, A., A joint economic-lot-size model for purchaser and vendor, Decision Sciences, 17, 292-311 (1986)
[2] Ben-Daya, M.; Raouf, A., Inventory models involving lead time as a decision variable, Journal of the Operational Research Society, 45, 5, 579-582 (1994) · Zbl 0805.90037
[3] Chen, C. K.; Chang, H. C.; Ouyang, L. Y., A continuous review inventory model with ordering cost dependent on lead time, International Journal of Information and Management Sciences, 12, 3, 1-13 (2001) · Zbl 1003.90003
[4] Chiu, P.P., 1998. Economic production quantity models involving lead time as a decision variable. Master Thesis: National Taiwan University of Science and Technology.; Chiu, P.P., 1998. Economic production quantity models involving lead time as a decision variable. Master Thesis: National Taiwan University of Science and Technology.
[5] Goyal, S. K., An integrated inventory model for a single supplier-single customer problem, International Journal of Production Research, 15, 1, 107-111 (1976)
[6] Goyal, S. K., A joint economic-lot-size model for purchaser and vendor: A comment, Decision Sciences, 19, 236-241 (1988)
[7] Goyal, S. K., A one-vendor multi-buyer integrated inventory model: A comment, European Journal of Operational Research, 82, 209-210 (1995) · Zbl 0914.90133
[8] Ha, D.; Kim, S. L., Implementation of JIT purchasing: An integrated approach, Production Planning and Control, 8, 2, 152-157 (1997)
[9] Hadley, G.; Whitin, T., Analysis of Inventory Systems (1963), Prentice-Hall: Prentice-Hall New Jersey · Zbl 0133.42901
[10] Hall, R. W., Zero Inventories (1983), Dow Jones-Irwin: Dow Jones-Irwin Homewood, Illinois
[11] Hariga, M.; Ben-Daya, M., Some stochastic inventory models with deterministic variable lead time, European Journal of Operational Research, 113, 42-51 (1999) · Zbl 0933.90005
[12] Hill, R. M., The single-vendor single-buyer integrated production-inventory model with a generalized policy, European Journal of Operational Research, 97, 493-499 (1997) · Zbl 0919.90053
[13] Hill, R. M., The optimal production and shipment policy for the single-vendor single-buyer integrated production-inventory problem, International Journal of Production Research, 37, 11, 2463-2475 (1999) · Zbl 0949.90567
[14] Keller, G.; Noori, H., Justifying new technology acquisition through its impact on the cost of running an inventory policy, IIE Transitions, 20, 284-291 (1988)
[15] Kim, K. L.; Hayya, J. C.; Hong, J. D., Setup reduction in economic production quantity model, Decision Sciences, 23, 500-508 (1992)
[16] Liao, C. J.; Shyu, C. H., An analytical determination of lead time with normal demand, International Journal of Operations and Production Management, 11, 72-78 (1991)
[17] Moon, I.; Choi, S., A note on lead time and distributional assumptions in continuous review inventory models, Computers and Operations Research, 25, 1007-1012 (1998) · Zbl 1042.90509
[18] Nasri, F.; Affisco, J. F.; Paknejad, M. J., Setup cost reduction in an inventory model with finite-range stochastic lead times, International Journal of Production Research, 28, 199-212 (1990) · Zbl 0686.90019
[19] Ouyang, L. Y.; Chang, H. C., Lot size reorder point inventory model with controllable lead time and set-up cost, International Journal of Systems Science, 33, 8, 635-642 (2002) · Zbl 1020.90001
[20] Ouyang, L. Y.; Chen, C. K.; Chang, H. C., Lead time and ordering cost reductions in continuous review inventory systems with partial backorders, Journal of the Operational Research Society, 50, 1272-1279 (1999) · Zbl 1054.90512
[21] Ouyang, L. Y.; Yeh, N. C.; Wu, K. S., Mixture inventory model with backorders and lost sales for variable lead time, Journal of the Operational Research Society, 47, 829-832 (1996) · Zbl 0856.90041
[22] Paknejad, M. J.; Nasri, F.; Affisco, J. F., Defective units in a continuous review \((s,Q)\) system, International Journal of Production Research, 33, 10, 2767-2777 (1995) · Zbl 0910.90128
[23] Pan, J. C.; Hsiao, Y. C.; Lee, C. J., Inventory models with fixed and variable lead time crash costs considerations, Journal of the Operational Research Society, 53, 9, 1048-1053 (2002) · Zbl 1139.90318
[24] Pan, J. C.; Yang, J. S., A study of an integrated inventory with controllable lead time, International Journal of Production Research, 40, 5, 1263-1273 (2002) · Zbl 1027.90024
[25] Porteus, E. L., Investing in reduced setups in the EOQ model, Management Science, 31, 998-1010 (1985) · Zbl 0609.90058
[26] Tersine, R. J., Principles of Inventory and Materials Management (1994), Prentice Hall: Prentice Hall Englewood Cliffs, New Jersey
This reference list is based on information provided by the publisher or from digital mathematics libraries. Its items are heuristically matched to zbMATH identifiers and may contain data conversion errors. In some cases that data have been complemented/enhanced by data from zbMATH Open. This attempts to reflect the references listed in the original paper as accurately as possible without claiming completeness or a perfect matching.