Nakagawa, T.; Osaki, S. Optimum ordering policies with lead time for an operating unit. (English) Zbl 0402.90047 RAIRO, Rech. Opér. 12, 383-393 (1978). Page: −5 −4 −3 −2 −1 ±0 +1 +2 +3 +4 +5 Show Scanned Page Cited in 9 Documents MSC: 90B35 Deterministic scheduling theory in operations research 90B25 Reliability, availability, maintenance, inspection in operations research Keywords:Optimum Ordering Policies; Lead Time; Repair Limit Policies; Space Units; Replacement PDFBibTeX XMLCite \textit{T. Nakagawa} and \textit{S. Osaki}, RAIRO, Rech. Opér. 12, 383--393 (1978; Zbl 0402.90047) Full Text: DOI EuDML