Result 1 to 4 from 4 total
The resource-constrained activity insertion problem with minimum and maximum time lags. (English)
J. Sched. 12, No. 5, 447-460 (2009).
1
Time and resource constrained scheduling. A constraint satisfaction approach. (English)
Eindhoven: Univ. of Technology. x, 157 p. (1994).
2
Resource-constrained multi-project scheduling by bounded enumeration. (English)
Methods Oper. Res. 58, 157-169 (1989).
3
A multiobjective, multi-level heuristic for dynamic resource constrained scheduling problems. (English)
Eur. J. Oper. Res. 33, 30-41 (1988).
4
Result 1 to 4 from 4 total