Result 1 to 20 of 702 total
Data center topologies for mission-critical business systems. (English)
IBM Syst. J. 47, No. 4, 695-706 (2008).
1
IBM totalstorage productivity center for replication for z/OS. (English)
IBM Syst. J. 47, No. 4, 681-694 (2008).
2
Enhancing availability with service automation and a trusted support partner. (English)
IBM Syst. J. 47, No. 4, 667-680 (2008).
3
Scoring and thresholding for availability. (English)
IBM Syst. J. 47, No. 4, 665-666 (2008).
4
The resiliency challenge presented by soft failure incidents. (English)
IBM Syst. J. 47, No. 4, 641-652 (2008).
5
Availability analysis of blade server systems. (English)
IBM Syst. J. 47, No. 4, 621-640 (2008).
6
From high availability and disaster recovery to business continuity solutions. (English)
IBM Syst. J. 47, No. 4, 605-619 (2008).
7
Leveraging virtualization to optimize high-availability system configurations. (English)
IBM Syst. J. 47, No. 4, 591-604 (2008).
8
Three reliability engineering techniques and their application to evaluating the availability of IT systems: an introduction. (English)
IBM Syst. J. 47, No. 4, 577-589 (2008).
9
Combining high availability and disaster recovery solutions for critical IT environments. (English)
IBM Syst. J. 47, No. 4, 563-575 (2008).
10
IT service management for high availability. (English)
IBM Syst. J. 47, No. 4, 549-561 (2008).
11
Resilient hosting in a continuously available virtualized environment. (English)
IBM Syst. J. 47, No. 4, 535-548 (2008).
12
IBM power systems platform: Advancements in the state of the art in IT availability. (English)
IBM Syst. J. 47, No. 4, 519-533 (2008).
13
IBM parallel sysplex clustering: technology options for continuous availability. (English)
IBM Syst. J. 47, No. 4, 505-517 (2008).
14
Achieving continuous availability of IBM systems infrastructures. (English)
IBM Syst. J. 47, No. 4, 493-503 (2008).
15
Preface. (English)
IBM Syst. J. 47, No. 4, 491 (2008).
16
Message from the vice president, solutions \& global technical sales, IBM global sales \& distribution. (English)
IBM Syst. J. 47, No. 4, 1 (2008).
17
Increasing business flexibility and SOA adoption through effective SOA governance. (English)
IBM Syst. J. 47, No. 3, 473-488 (2008).
18
Business-process-driven gray-box SOA testing. (English)
IBM Syst. J. 47, No. 3, 457-472 (2008).
19
A runtime-adaptable service bus design for telecom operations support systems. (English)
IBM Syst. J. 47, No. 3, 445-456 (2008).
20
Result 1 to 20 of 702 total