History


Please fill in your query. A complete syntax description you will find on the General Help page.
first | previous | 1 | next | last

Result 1 to 7 of 7 total

Joint scheduling of jobs and preventive maintenance operations in the flowshop sequencing problem: a resolution with sequential and integrated strategies. (English)
Int. J. Manuf. Res. 6, No. 1, 30-48 (2011).
WorldCat.org
1
Proactive, dynamic and multi-criteria scheduling of maintenance activities. (English)
Int. J. Prod. Res. 47, No. 8, 2185-2201 (2009).
WorldCat.org
2
Resolution of joint maintenance/production scheduling by sequential and integrated strategies (English)
IWANN (2), 782-789 (2003).
WorldCat.org
3
Resolution of the cyclic multi-hoists scheduling problem with overlapping partitions. (English)
INFOR 35, No.4, 309-324 (1997).
WorldCat.org
4
Outil d’aide à l’élaboration d’ordonnancement cyclique pour les lignes de traitement de surface (English)
JFPLC, 365-368 (1995).
WorldCat.org
5
Le traitement des contraintes disjonctives dans un problème d’ordonnancement : exemple du {\tt<\hskip-.5e<}Hoist scheduling problem{\tt>\hskip-.5e>} (English)
JFPL, 343-363 (1993).
WorldCat.org
6
First results of a French linguistic development environment (English)
COLING, 1177-1181 (1992).
WorldCat.org
7
first | previous | 1 | next | last

Result 1 to 7 of 7 total

Valid XHTML 1.0 Transitional Valid CSS!