Result 1 to 20 of 64 total
Centralized fleet management system for cybernetic transportation (English)
Expert Syst. Appl. 38, No. 4, 3710-3717 (2011).
1
Algorithms for partitioning of large routing networks. (English)
J. Oper. Res. Soc. 61, No. 7, 1159-1167 (2010).
2
Pricing strategies and models (English)
Annual Reviews in Control 34, No. 1, 101-110 (2010).
3
Algorithms for partitioning of large routing networks (English)
JORS 61, No. 7, 1159-1167 (2010).
4
Minimizing the number of machines for minimum length schedules. (English)
Eur. J. Oper. Res. 199, No. 3, 702-705 (2009).
5
The one machine scheduling problem: insertion of a job under the real-time constraint. (English)
Eur. J. Oper. Res. 199, No. 3, 695-701 (2009).
6
A data mining approach for adaptive path planning on large road networks (English)
Foundations of Computational Intelligence (6), 297-320 (2009).
7
Optimisation of multi-position machines and transfer lines. (English)
Eur. J. Oper. Res. 185, No. 3, 1375-1389 (2008).
8
Scheduling in supply chain environment. (English)
Eur. J. Oper. Res. 183, No. 3, 961-970 (2007).
9
Scheduling: new trends in industrial environment (English)
Annual Reviews in Control 31, No. 1, 157-166 (2007).
10
Single machine scheduling and due date assignment under series-parallel precedence constraints. (English)
CEJOR, Cent. Eur. J. Oper. Res. 13, No. 1, 15-35 (2005).
11
Insertion of a random task in a schedule: a real-time approach. (English)
Eur. J. Oper. Res. 164, No. 1, 52-63 (2005).
12
Single machine scheduling with precedence constraints and SLK due date assignment. (English)
Ahr, Dino (ed.) et al., Operations research. Proceedings 2003. Selected papers of the international conference on operations research (OR 2003), Heidelberg, Germany, September 3‒5, 2003. Berlin: Springer (ISBN 3-540-21445-3/pbk). 157-164 (2004).
13
Insertion of a random bitask in a schedule: a real-time approach. (English)
Comput. Oper. Res. 31, No. 5, 779-790 (2004).
14
Insertion of a random bitask in a schedule: a real-time approach (English)
Computers & OR 31, No. 5, 779-790 (2004).
15
The concave cost supply problem. (English)
Eur. J. Oper. Res. 148, No. 2, 374-383 (2003).
16
Optimization of cyclic production systems: a heuristic approach (English)
IEEE Transactions on Robotics 19, No. 1, 150-154 (2003).
17
Multifunction radar: Task scheduling. (English)
J. Math. Model. Algorithms 1, No. 2, 105-116 (2002).
18
A survey of the state-of-the-art of common due date assignment and scheduling research. (English)
Eur. J. Oper. Res. 139, No.1, 1-25 (2002).
19
Multifunction radar: task scheduling (English)
J. Math. Model. Algorithms 1, No. 2, 105-116 (2002).
20
Result 1 to 20 of 64 total