A scheduling system for the steelmaking-continuous casting process. A case study from the steel-making industry. (English)
Int. J. Prod. Res. 47, No. 15, 4147-4172 (2009).
1
Optimal lower bounds on the contribution margin in the case of stochastic order arrival. (English)
OR Spectrum 25, No. 4, 497-519 (2003).
2
Aggregate order release planning for time-varying demand. (English)
Int. J. Prod. Res. 40, No. 3, 699-718 (2002).
3