Result 1 to 20 of 51 total
Parallel $4(3)$ Runge-Kutta pairs for two processors implementation. (English)
Menemui Mat. 31, No. 1, 36-42 (2009).
1
Scheduling trees with large communication delays on two identical processors. (English)
J. Sched. 8, No. 2, 179-190 (2005).
2
Semi-on-line scheduling on two parallel processors with an upper bound on the items. (English)
Algorithmica 37, No. 4, 243-262 (2003).
3
Towards an NMR implementation of a quantum lattice gas algorithm. (English)
Comput. Phys. Commun. 146, No.3, 339-344 (2002).
4
Flow simulation with FEM on massively parallel systems. (English)
Wagner, Siegfried (ed.), Computational fluid dynamics on parallel systems. Proceedings of a CNRS-DFG symposium in Stuttgart, Germany, December 9 and 10, 1993. Braunschweig: Vieweg. Notes Numer. Fluid Mech. 50, 147-156 (1995).
5
Makespan minimization for $m$ parallel identical processors. (English)
Nav. Res. Logist. 42, No.6, 935-948 (1995).
6
Parallel cutting stock algorithms. (English)
Econ. Comput. Econ. Cybern. Stud. Res. 28, No.1-4, 19-23 (1994).
7
Polynomially resolvable problems of composition of cyclic schedulings. (Russian)
Issled. Oper. Stat. Model. 6, 5-13 (1994).
8
On the complexity of the process shop. (English)
INFOR 32, No.2, 99-109 (1994).
9
Unilateral contact problem for finite bodies ‒ parallel implementation. (English)
Comput. Mech. 13, No.6, 414-426 (1994).
10
Performance Evaluation of Dynamic Sharing of Processors in Two-Stage Parallel Processing Systems. (English)
IEEE Transactions on Parallel and Distributed Systems 04, No.03, 306-317 (1993).
11
A Polynomial Time Algorithm for Reconfiguring Multiple-Track Models. (English)
IEEE Transactions on Computers 42, No.04, 385-395 (1993).
12
Two parallel processors with coupled inputs (with an afterword by Alan Weiss). (English)
Adv. Appl. Probab. 24, No.4, 986-1007 (1992).
13
A multi-stage parallel-processor flowshop problem with minimum flowtime. (English)
Eur. J. Oper. Res. 57, No.1, 111-122 (1992).
14
Optimal scheduling of exponential tasks with in-tree precedence constraints on two parallel processors subject to failure and repair. (English)
Oper. Res. 40, Suppl. 2, 263-271 (1992).
15
Fixed job scheduling with two types of processors. (English)
Oper. Res. 40, No.Suppl., S76-S85 (1992).
16
Hierarchical control of the two processor flow-shop with state dependent processing times: Complexity analysis and approximate algorithms. (English)
INFOR 29, No.3, 193-205 (1991).
17
Orthogonal multiprocessor sharing memory with an enhanced mesh for integrated image understanding. (English)
CVGIP: Image Underst. 53, No.1, 31-45 (1991).
18
A parallel algorithm for two processors precedence constraint scheduling. (English)
Automata, languages and programming, Proc. 18th Int. Colloq., Madrid/Spain 1991, Lect. Notes Comput. Sci. 510, 417-428 (1991).
19
Stochastic dispatching of multi-priority jobs to heterogeneous processors. (English)
J. Appl. Probab. 27, No.4, 852-861 (1990).
20
Result 1 to 20 of 51 total