Result 1 to 16 of 16 total
A $(μ,\, λ)$-coordination mechanism for agent-based multi-project scheduling. (English)
OR Spectrum 34, No. 1, 107-132 (2012).
1
A generic coordination mechanism for lot-sizing in supply chains (English)
Electronic Commerce Research 11, No. 2, 123-149 (2011).
2
Decentralized multi-level uncapacitated lot-sizing by automated negotiation. (English)
4OR 8, No. 2, 155-180 (2010).
3
Decentralized multi-level uncapacitated lot-sizing by automated negotiation (English)
4OR 8, No. 2, 155-180 (2010).
4
A pheromone-based negotiation mechanism for lot-sizing in supply chains (English)
HICSS, 1-10 (2010).
5
An ant colony optimization approach for the multi-level unconstrained lot-sizing problem (English)
HICSS, 1-7 (2009).
6
A parallel genetic algorithm for the multilevel unconstrained lot-sizing problem. (English)
INFORMS J. Comput. 20, No. 1, 124-132 (2008).
7
A two-level parallel genetic algorithm for the uncapacitated warehouse location problem (English)
HICSS, 67 (2008).
8
Untersuchung von multipass-strategien für das RCPSP/prax (English)
Intelligente Systeme zur Entscheidungsunterstützung, 33-48 (2008).
9
A web-service based architecture for a multi-agent system in decentralized multi-project planning. (Eine Web-Service basierte Architektur für ein Multi-Agenten System zur dezentralen Multi-Projekt Planung.) (German)
Waldmann, Karl-Heinz (ed.) et al., Operations research proceedings 2006. Selected papers of the annual international conference of the German Operations Research Society (GOR), jointly organized with the Austrian Society of Operations Research (ÖGOR) and the Swiss Society of Operations Research (SVOR), Karlsruhe, Germany, September 6‒8, 2006. Berlin: Springer (ISBN 978-3-540-69994-1/pbk). 541-546 (2007).
10
A multi-agent system for the decentralized resource-constrained multi-project scheduling problem. (English)
Int. Trans. Oper. Res. 14, No. 6, 565-589 (2007).
11
Eine web-service basierte architektur für ein multi-agenten system zur dezentralen multi-projekt planung (English)
OR, 541-546 (2006).
12
A two-phase hybrid metaheuristic for the vehicle routing problem with time windows. (English)
Eur. J. Oper. Res. 162, No. 1, 220-238 (2005).
13
Parallelization of a two-phase metaheuristic for routing problems with time windows. (English)
J. Heuristics 8, No.3, 251-276 (2002).
14
Large benchmark problems for the standard problem of route planning under time frame restrictions. (Neue große Benchmarkprobleme für das Standardproblem der Tourenplanung mit Zeitfensterrestriktionen.) (German)
Fleischmann, Bernhard (ed.) et al., Operations research proceedings 2000. Selected papers of the symposium, OR 2000, Dresden, Germany, September 9‒12, 2000. Berlin: Springer (ISBN 3-540-41587-4). 414-419 (2001).
15
A simulated-annealing method for the standard problem of vehicle routing with time window constraints. (Ein Simulated-Annealing-Verfahren für das Standardproblem der Tourenplanung mit Zeitfensterrestriktionen.) (German)
Kall, Peter (ed.) et al., Operations research proceedings 1998. Selected papers of the 4th annual international conference, OR98 held in Zürich, Switzerland, August 31-September 3, 1998. Berlin: Springer. 483-492 (1999).
16
Result 1 to 16 of 16 total