Result 1 to 20 of 57 total
Multi-objective supply planning for two-level assembly systems with stochastic lead times. (English)
Comput. Oper. Res. 39, No. 7, 1325-1332 (2012).
1
Realistic two-stage flowshop batch scheduling problems with transportation capacity and times. (English)
Appl. Math. Modelling 36, No. 2, 723-735 (2012).
2
Multi-objective supply planning for two-level assembly systems with stochastic lead times (English)
Computers & OR 39, No. 7, 1325-1332 (2012).
3
Bi-objective parallel machines scheduling with sequence-dependent setup times using hybrid metaheuristics and weighted min-max technique. (English)
Soft Comput. 15, No. 7, 1313-1331 (2011).
4
A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain. (English)
Comput. Math. Appl. 62, No. 8, 3251-3269 (2011).
5
Bi-criteria assembly line balancing by considering flexible operation times. (English)
Appl. Math. Modelling 35, No. 12, 5592-5608 (2011).
6
Hybrid flowshop scheduling with machine and resource-dependent processing times. (English)
Appl. Math. Modelling 35, No. 3, 1107-1123 (2011).
7
Scheduling open shops with parallel machines to minimize total completion time. (English)
J. Comput. Appl. Math. 235, No. 5, 1275-1287 (2011).
8
Corrigendum to: "genetic algorithm for supply planning in two-level assembly systems with random lead times" [Engineering applications of artificial intelligence 22 (2009) 906-915] (English)
Eng. Appl. of AI 24, No. 5, 917-918 (2011).
9
Genetic algorithm-based heuristic for capacitated lotsizing problem in flow shops with sequence-dependent setups (English)
Expert Syst. Appl. 38, No. 6, 7201-7207 (2011).
10
Bi-objective optimization research on integrated fixed time interval preventive maintenance and production for scheduling flexible job-shop problem (English)
Expert Syst. Appl. 38, No. 6, 7169-7178 (2011).
11
Meta-heuristics implementation for scheduling of trucks in a cross-docking system with temporary storage (English)
Expert Syst. Appl. 38, No. 3, 1964-1979 (2011).
12
A genetic algorithm for simultaneous lotsizing and sequencing of the permutation flow shops with sequence-dependent setups (English)
Int. J. Computer Integrated Manufacturing 24, No. 1, 87-93 (2011).
13
Scheduling open shops with parallel machines to minimize total completion time (English)
J. Computational Applied Mathematics 235, No. 5, 1275-1287 (2011).
14
A multi-objective quantity discount and joint optimization model for coordination of a single-buyer multi-vendor supply chain (English)
Computers & Mathematics with Applications 62, No. 8, 3251-3269 (2011).
15
Development of a PSO-SA hybrid metaheuristic for a new comprehensive regression model to time-series forecasting. (English)
Expert Syst. Appl. 37, No. 2, 974-984 (2010).
16
Development of a hybrid metaheuristic to minimise earliness and tardiness in a hybrid flowshop with sequence-dependent setup times. (English)
Int. J. Prod. Res. 48, No. 5, 1415-1438 (2010).
17
MIP-based heuristics for lotsizing in capacitated pure flow shop with sequence-dependent setups. (English)
Int. J. Prod. Res. 48, No. 10, 2957-2973 (2010).
18
A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling. (English)
Int. J. Prod. Res. 48, No. 17, 4949-4976 (2010).
19
A hybrid scatter search approach for resource-constrained project scheduling problem in PERT-type networks. (English)
Adv. Eng. Softw. 41, No. 7-8, 966-975 (2010).
20
Result 1 to 20 of 57 total