Result 21 to 40 of 54 total
Dynamic job shop scheduling using variable neighbourhood search. (English)
Int. J. Prod. Res. 48, No. 8, 2449-2458 (2010).
21
Scheduling a dynamic flexible flow line with sequence-dependent setup times: a simulation analysis. (English)
Int. J. Prod. Res. 48, No. 14, 4019-4042 (2010).
22
A multi-phase covering Pareto-optimal front method to multi-objective parallel machine scheduling. (English)
Int. J. Prod. Res. 48, No. 17, 4949-4976 (2010).
23
Selecting suppliers using a new fuzzy multiple criteria decision model: the fuzzy balancing and ranking method. (English)
Int. J. Prod. Res. 48, No. 18, 5307-5326 (2010).
24
A variable neighbourhood search algorithm for the flexible job-shop scheduling problem. (English)
Int. J. Prod. Res. 48, No. 19, 5671-5689 (2010).
25
A contribution and new heuristics for open shop scheduling. (English)
Comput. Oper. Res. 37, No. 1, 213-221 (2010).
26
Algorithms for a realistic variant of flowshop scheduling. (English)
Comput. Oper. Res. 37, No. 2, 236-246 (2010).
27
Two robust meta-heuristics for scheduling multiple job classes on a single machine with multiple criteria (English)
Expert Syst. Appl. 37, No. 8, 5951-5959 (2010).
28
Multi-objective scheduling of dynamic job shop using variable neighborhood search (English)
Expert Syst. Appl. 37, No. 1, 282-287 (2010).
29
Integrating non-preemptive open shops scheduling with sequence-dependent setup times using advanced metaheuristics (English)
Expert Syst. Appl. 37, No. 1, 259-266 (2010).
30
Bi-objective group scheduling in hybrid flexible flowshop: A multi-phase approach (English)
Expert Syst. Appl. 37, No. 6, 4024-4032 (2010).
31
Flexible job-shop scheduling with parallel variable neighborhood search algorithm (English)
Expert Syst. Appl. 37, No. 1, 678-687 (2010).
32
An integrated eigenvector-DEA-TOPSIS methodology for portfolio risk evaluation in the FOREX spot market (English)
Expert Syst. Appl. 37, No. 1, 509-516 (2010).
33
An artificial immune algorithm for the flexible job-shop scheduling problem (English)
Future Generation Comp. Syst. 26, No. 4, 533-541 (2010).
34
Scheduling trucks in cross-docking systems: robust meta-heuristics (English)
Computers & Industrial Engineering 58, No. 1, 12-24 (2010).
35
Algorithms for a realistic variant of flowshop scheduling (English)
Computers & OR 37, No. 2, 236-246 (2010).
36
A contribution and new heuristics for open shop scheduling (English)
Computers & OR 37, No. 1, 213-221 (2010).
37
Brokering as a mechanism for the social production of meaning (English)
ICLS, 33-35 (2010).
38
A hybrid multi-criteria decision-making model for firms competence evaluation. (English)
Expert Syst. Appl. 36, No. 10, 12314-12322 (2009).
39
A multi-phase covering Pareto-optimal front method to multi-objective scheduling in a realistic hybrid flowshop using a hybrid metaheuristic. (English)
Expert Syst. Appl. 36, No. 8, 11057-11069 (2009).
40
Result 21 to 40 of 54 total