Comments on the mixture detection rule used in SPC control charts. (English)
Commun. Stat., Simulation Comput. 36, No. 6, 1321-1331 (2007).
1
Developing project duration models in software engineering. (English)
J. Comput. Sci. Technol. 22, No. 3, 348-357 (2007).
2
Estimating the parameters of a generalized lambda distribution (English)
Computational Statistics & Data Analysis 51, No. 6, 2813-2835 (2007).
3
Developing project duration models in software engineering (English)
J. Comput. Sci. Technol. 22, No. 3, 348-357 (2007).
4
The design and implementation of the SSDB (English)
SSDBM, 245-260 (1986).
5