Result 1 to 11 from 11 total
Resource allocation and target setting for parallel production system based on DEA. (English)
Appl. Math. Modelling 35, No. 9, 4270-4280 (2011).
1
Preventive maintenance scheduling for a multi-component system with non-negligible replacement time. (English)
Int. J. Syst. Sci. 41, No. 7, 747-761 (2010).
2
An analytical formula for variance of output from a series-parallel production system with no interstation buffers and time-dependent failures. (English)
Math. Comput. Modelling 27, No.6, 95-112 (1998).
3
Exploiting application parallelism in knowledge-based systems: An experimental method. (English)
Concurrency Pract. Exp. 8, No. 1, 1-18 (1996).
4
Stochastic analysis of a split production system with an initial buffer. (English)
SCIMA 22, No.2-3, 81-93 (1993).
5
Organization Self-Design of Distributed Production Systems. (English)
IEEE Transactions on Knowledge and Data Engineering 04, No.02, 123-134 (1992).
6
The search ahead conflict resolution for the parallel firing of production systems. (English)
IJCAI 89, Proc. Int. Conf., Detroit, MI/USA 1989, 91-96 (1989).
7
Routing and scheduling within a job shop framework. (English)
Found. Control Eng. 14, No.2, 53-60 (1989).
8
Hierarchical scheduling flowshops with parallel machines and finite in- process buffers. (English)
Arch. Autom. Telemech. 33, No.3, 403-414 (1988).
9
Two-phase algorithm for lot size scheduling in single-stage production systems with parallel facilities. (English)
Bull. Pol. Acad. Sci., Tech. Sci. 35, 77-81 (1987).
10
On systems’ reliability and redundancy. (English)
Int. J. Gen. Syst. 9, 261-266 (1983).
11
Result 1 to 11 from 11 total