@article {IOPORT.06047250, author = {Mosheiov, Gur and Oron, Daniel}, title = {Batch scheduling on a two-machine jobshop with machine-dependent setup times.}, year = {2011}, journal = {Naval Research Logistics}, volume = {58}, number = {7}, issn = {0894-069X}, pages = {676-684}, publisher = {John Wiley \& Sons, Hoboken, NJ}, doi = {10.1002/nav.20473}, abstract = {Summary: The problem of minimum makespan on an m machine jobshop with unit execution time (UET) jobs ($m \geq 3$) is known to be strongly NP-hard even with no setup times. We focus in this article on the two-machine case. We assume UET jobs and consider batching with batch availability and machine-dependent setup times. We introduce an efficient $(O (\sqrt n))$ algorithm, where n is the number of jobs. We then introduce a heuristic for the multimachine case and demonstrate its efficiency for two interesting instances.}, identifier = {06047250}, }