On heuristic approach for solution of a scheduling problem involving weights of jobs and break-down times for machines. (English)
J. Indian Soc. Stat. Oper. Res. 9, No.1-4, 21-24 (1988).
Summary: This paper deals with a flow-shop scheduling problem in which weights of jobs and break-down times of machines are considered. A heuristic approach method to find an optimal or near optimal sequence minimizing the total weighted mean production flow-time for the problem has been discussed.