History


Please fill in your query. A complete syntax description you will find on the General Help page.
first | previous | 1 21 41 61 | next | last

Result 1 to 20 of 77 total

Optimal reserve inventory between two machines when the repair time has change of distribution after a change point. (English)
Int. Math. Forum 7, No. 53-56, 2659-2668 (2012).
WorldCat.org
1
A batch arrival retrial queue with general retrial times under Bernoulli vacation schedule for unreliable server and delaying repair. (English)
Appl. Math. Modelling 36, No. 1, 255-269 (2012).
WorldCat.org
2
The optimal control of an unreliable server queue with two phases of service and Bernoulli vacation schedule. (English)
Math. Comput. Modelling 54, No. 1-2, 673-688 (2011).
WorldCat.org
3
Optimal deteriorating items production inventory models with random machine breakdown and stochastic repair time. (English)
Appl. Math. Modelling 35, No. 7, 3495-3508 (2011).
WorldCat.org
4
Stochastic behavior of an $(n+1)$-unit cold standby system with two types of repairman, patience time and two types of failures. (English)
Int. J. Appl. Math. 23, No. 5, 909-925 (2010).
WorldCat.org
5
Reliability computation for complex systems with parallel structure that are completely repairable during use. (English)
Autom. Remote Control 71, No. 6, 1257-1264 (2010); translation from Uprav. Bol’sh. Sist. 2008, No. 23, 156-169 (2008).
WorldCat.org
6
Bridge preventive maintenance based on life-cycle assessment. (English)
Rev. Téc. Fac. Ing., Univ. Zulia 33, No. 1, 3-10 (2010).
WorldCat.org
7
Stochastic behavior of a two-unit standby system with two types of repairman, patience time and three types of failures. (English)
Int. J. Appl. Math. 23, No. 1, 99-111 (2010).
WorldCat.org
8
A study on a two unit standby system with Erlang repair time and human error. (English)
Int. J. Appl. Math. 22, No. 7, 1051-1058 (2009).
WorldCat.org
9
An $M/G/1$ queue with two phases of service subject to the server breakdown and delayed repair. (English)
Appl. Math. Modelling 33, No. 6, 2699-2709 (2009).
WorldCat.org
10
The $N$-policy for an unreliable server with delaying repair and two phases of service. (English)
J. Comput. Appl. Math. 231, No. 1, 349-364 (2009).
WorldCat.org
11
Optimization of the $T$ policy M/G/1 queue with server breakdowns and general startup times. (English)
J. Comput. Appl. Math. 228, No. 1, 270-278 (2009).
WorldCat.org
12
Determining economic manufacturing quantity for an unreliable manufacturing system in discrete time setting. (English)
Int. J. Oper. Res. 3, No. 5, 557-574 (2008).
WorldCat.org
13
A multiechelon repairable item inventory system with lateral transshipment and a general repair time distribution. (English)
Informatica, Vilnius 17, No. 3, 381-392 (2006).
WorldCat.org
14
Statistical estimation algorithms for repairs-time limit replacement scheduling under earning rate criteria. (English)
Comput. Math. Appl. 51, No. 2, 345-356 (2006).
WorldCat.org
15
Cost evaluation for an imperfect-repair model with random repair time. (English)
Int. J. Syst. Sci. 36, No. 11, 717-726 (2005).
WorldCat.org
16
The optimal repair-time limit replacement policy with imperfect repair: Lorenz transform approach. (English)
Math. Comput. Modelling 38, No. 11-12, 1169-1176 (2003).
WorldCat.org
17
Reliability estimation of a repairable standby redundant system. (English)
Stat. Pap. 43, No.3, 323-336 (2002).
WorldCat.org
18
Control policies of an $M/G/1$ queueing system with a removable and non-reliable server. (English)
Int. Trans. Oper. Res. 9, No.2, 195-212 (2002).
WorldCat.org
19
A two-identical-unit deteriorating standby system with varying workload and post repair. (English)
Varāhmihir J. Math. Sci. 1, No. 1, 91-101 (2001).
WorldCat.org
20
first | previous | 1 21 41 61 | next | last

Result 1 to 20 of 77 total

Valid XHTML 1.0 Transitional Valid CSS!